| Removed and disposed of properly prior to completion. | 2025-07-02 10:06:18 | |
| No waste will be produced once the ray is turned on. | 2025-07-02 10:06:21 | |
| And producing energy. There will be a maximum of. | 2025-07-02 10:06:24 | |
| Two Connex containers during construction. | 2025-07-02 10:06:27 | |
| There will not be any night light night. | 2025-07-02 10:06:30 | |
| Night lighting the applicant will. | 2025-07-02 10:06:33 | |
| Have preventative maintenance and inspections. | 2025-07-02 10:06:36 | |
| Conducted periodically when determined needed by its 20. | 2025-07-02 10:06:39 | |
| 4 hours some days a week monitoring and operation. | 2025-07-02 10:06:42 | |
| Vegetation maintenance will occur. | 2025-07-02 10:06:45 | |
| Approximately every 10 days based on site conditions. | 2025-07-02 10:06:48 | |
| And there will be 1 employee who will be on. | 2025-07-02 10:06:51 | |
| Inside occasionally during the operation of the SCS. | 2025-07-02 10:06:54 | |
| And accepted native. | 2025-07-02 10:06:57 | |
| Seed mixer will be planted on all the strip areas and will. | 2025-07-02 10:07:00 | |
| Not require irrigation once established. | 2025-07-02 10:07:03 | |
| There are no residences within 500 feet of the proposed. | 2025-07-02 10:07:06 | |
| Disturbed area. | 2025-07-02 10:07:09 | |
| Be permanently located at the site permanent water and. | 2025-07-02 10:07:12 | |
| Sewer is not required. | 2025-07-02 10:07:15 | |
| Toilets, hand washing units and bottled water can be util. | 2025-07-02 10:07:18 | |
| During construction, adjust. | 2025-07-02 10:07:21 | |
| Plan was submitted with which indicates. | 2025-07-02 10:07:24 | |
| Water will be used necessary as. | 2025-07-02 10:07:27 | |
| Necessary and the site will be revegetated. I'll be. | 2025-07-02 10:07:30 | |
| A decommissioning plan was submitted with the application. | 2025-07-02 10:07:33 | |
| And is currently under review. | 2025-07-02 10:07:36 | |
| One sign announcing. | 2025-07-02 10:07:39 | |
| The hearing was posted on May 20th, 2025 Which? | 2025-07-02 10:07:42 | |
| Which was at least 10 days prior to the Planning Commission here. | 2025-07-02 10:07:45 | |
| Weld County Department of Planning staff sent. | 2025-07-02 10:07:48 | |
| Notice the four surrounding property owners within 500. | 2025-07-02 10:07:51 | |
| The seat of the property. No phone or ring course. | 2025-07-02 10:07:54 | |
| Was received. | 2025-07-02 10:07:57 | |
| Site is not located within Three Mile referral. | 2025-07-02 10:08:00 | |
| Area of any municipality and is not. | 2025-07-02 10:08:03 | |
| Any IGA or CPA? | 2025-07-02 10:08:06 | |
| 1B Your acknowledgement can take. | 2025-07-02 10:33:35 | |
| Many forms to CPW and again my opinion. | 2025-07-02 10:33:38 | |
| In is. Is that there? | 2025-07-02 10:33:41 | |
| Referral is simply just a request and it's not a requirement. | 2025-07-02 10:33:44 | |
| Thank you for that. | 2025-07-02 10:33:47 | |
| Page 6. | 2025-07-02 10:33:53 | |
| Alright. | 2025-07-02 10:33:59 | |
| Development Standards, page 7. | 2025-07-02 10:34:02 | |
| KNN. | 2025-07-02 10:34:05 | |
| Page 9. | 2025-07-02 10:34:11 | |
| Madam Chair, yes, Commissioner Maxine. | 2025-07-02 10:34:14 | |
| Page 9 that I just uh, am asking about, uh, number. | 2025-07-02 10:34:17 | |
| Number one, maybe a quick question #15. | 2025-07-02 10:34:20 | |
| Doesn't appear that there are any irrigation system. | 2025-07-02 10:34:23 | |
| On the property nor adjacent. | 2025-07-02 10:34:26 | |
| I guess I'm I'm not going to ask you if there are. | 2025-07-02 10:34:29 | |
| Not to my knowledge, no. | 2025-07-02 10:34:32 | |
| And and maybe look to staff and say in your investigation. | 2025-07-02 10:34:35 | |
| And site visits of the property. Did you see any irrigation systems? | 2025-07-02 10:34:38 | |
| On or adjacent to. | 2025-07-02 10:34:41 | |
| This slide shows you. | 2025-07-02 10:08:09 | |
| Based on unincorporated land surrounding the property. | 2025-07-02 10:08:13 | |
| This map shows the foreign. | 2025-07-02 10:08:18 | |
| USRS within one mile of the site. | 2025-07-02 10:08:21 | |
| This map shows the aerial imagery of. | 2025-07-02 10:08:27 | |
| Of the parcels and the adjacent rights of way. | 2025-07-02 10:08:30 | |
| This slide shows. | 2025-07-02 10:08:33 | |
| Approximate proposed location of the solar panels with. | 2025-07-02 10:08:37 | |
| A 500 foot buffer in correlation to the nearest residual. | 2025-07-02 10:08:39 | |
| This map is a draft of the solar panel location. | 2025-07-02 10:08:46 | |
| As submitted in the application materials. | 2025-07-02 10:08:48 | |
| A site visit was. | 2025-07-02 10:08:51 | |
| On May 20th, 2025, where the following F. | 2025-07-02 10:08:55 | |
| Those we're taking this is the view looking. | 2025-07-02 10:08:58 | |
| North from the sun this is a view looking. | 2025-07-02 10:09:01 | |
| This is a view like. | 2025-07-02 10:09:04 | |
| Himself, this is a view looking. | 2025-07-02 10:09:07 | |
| West, this is a view. | 2025-07-02 10:09:09 | |
| You looking E at the entrance of the property. | 2025-07-02 10:09:13 | |
| And this is the view looking South. | 2025-07-02 10:09:15 | |
| Towards the oil and gas facilities on the same property. | 2025-07-02 10:09:19 | |
| 40 The Lanning. | 2025-07-02 10:09:22 | |
| Commission after meeting on June 3rd, 2025 vote. | 2025-07-02 10:09:25 | |
| To recommend approval for the CSR along with. | 2025-07-02 10:09:28 | |
| The conditions of approval and development standards. | 2025-07-02 10:09:31 | |
| At this time, planning staff has concluded this presentation. | 2025-07-02 10:09:34 | |
| This applicant is president present and I am happy. | 2025-07-02 10:09:37 | |
| Answer any questions All right. Are there any questions? | 2025-07-02 10:09:40 | |
| Matthew. | 2025-07-02 10:09:42 | |
| It's your first presentation before the board, kind of Commissioner. Commissioner, can I ask? | 2025-07-02 10:09:46 | |
| You how Max Nader is to work with. | 2025-07-02 10:09:49 | |
| I agree with that. OK. | 2025-07-02 10:09:52 | |
| Thank you for your presentation logo. | 2025-07-02 10:09:55 | |
| Alright, Mike, good morning. | 2025-07-02 10:09:58 | |
| Miami Roberts with development review. | 2025-07-02 10:10:01 | |
| Access for the project side is on Calendar 40. | 2025-07-02 10:10:04 | |
| This portion of County Road 49 is gravel road and. | 2025-07-02 10:10:07 | |
| Designated on the Weld County functional classification may. | 2025-07-02 10:10:10 | |
| As a local Rd. Latest at. | 2025-07-02 10:10:13 | |
| Daily traffic on County Road 49 counted 100. | 2025-07-02 10:10:16 | |
| Vehicles per day with 41% trucks the 80. | 2025-07-02 10:10:19 | |
| 25th percentile speed is 51 mph. | 2025-07-02 10:10:22 | |
| Further, the applicants traffic information material and. | 2025-07-02 10:10:25 | |
| Equipment deliveries occurring for approximately 4 weeks will. | 2025-07-02 10:10:28 | |
| Will result in up to 24 vehicle trip. | 2025-07-02 10:10:31 | |
| Per day consisting of Conex container trucks delivered. | 2025-07-02 10:10:34 | |
| Three trucks and equipment hauling trucks. The phone. | 2025-07-02 10:10:37 | |
| Facility installation phase of the project. Lasting approach. | 2025-07-02 10:10:40 | |
| Four to six months will result in approximately 28 weeks. | 2025-07-02 10:10:43 | |
| Days off per day consisting of passenger vehicles, fuel. | 2025-07-02 10:10:46 | |
| Trucks and delivery trucks. Developer review. | 2025-07-02 10:10:49 | |
| Is requiring a road maintenance agreement for construction only. | 2025-07-02 10:10:52 | |
| The site requires double guards and. | 2025-07-02 10:10:55 | |
| 100 feet of Rd. base or Rd. base and all driving surf. | 2025-07-02 10:10:58 | |
| This is the service permanent trekking control. | 2025-07-02 10:11:01 | |
| The applicant has submitted the drainage narrative with supporting documents. | 2025-07-02 10:11:04 | |
| An adjacent meeting that this project would impact. | 2025-07-02 10:34:44 | |
| Commissioner, No, OK. | 2025-07-02 10:34:53 | |
| Thank you, Madam Chair. I would I would request that we strike. | 2025-07-02 10:34:56 | |
| 6:15 as it appears and. | 2025-07-02 10:34:59 | |
| From the information I've seen that there is no existing area. | 2025-07-02 10:35:02 | |
| Structures that this would impact. | 2025-07-02 10:35:05 | |
| OK, 15 is, uh, deleted. | 2025-07-02 10:35:08 | |
| And while you're striking #19 there you go. | 2025-07-02 10:35:11 | |
| #19 I heard from staff our. | 2025-07-02 10:35:14 | |
| Monday through Friday, 7:00 to 5:00. And I also heard from the. | 2025-07-02 10:35:17 | |
| Applicant No lighting is planned. I would request that we strike 19. | 2025-07-02 10:35:20 | |
| Alright. | 2025-07-02 10:35:23 | |
| #19 is stricken strip. | 2025-07-02 10:35:26 | |
| Alright, let's move on to page 10. | 2025-07-02 10:35:29 | |
| Page 11. | 2025-07-02 10:35:35 | |
| 12. | 2025-07-02 10:35:41 | |
| Right. And Commissioner Max may change it. | 2025-07-02 10:35:44 | |
| We're going to bout bring it back up to the public. Is there anybody who. | 2025-07-02 10:35:47 | |
| In the audience, they would like to speak on Dean. | 2025-07-02 10:35:50 | |
| Demonstrates the fact consists entirely of hydrological. | 2025-07-02 10:11:07 | |
| Group B as a result the site. | 2025-07-02 10:11:10 | |
| Is exempted from storm water detention. | 2025-07-02 10:11:13 | |
| 23-4-1030 Be one of the well. | 2025-07-02 10:11:16 | |
| County code Weld County grading permit will be. | 2025-07-02 10:11:19 | |
| Required of disturbing more than one acre and I'll be happy to answer any questions. | 2025-07-02 10:11:22 | |
| All right. Are there any questions the board you have, Commissioner Max? | 2025-07-02 10:11:25 | |
| Thank you, Madam Chair. Thanks, Mike, for that. Just a couple. | 2025-07-02 10:11:28 | |
| Real quick questions is I didn't see and if. | 2025-07-02 10:11:31 | |
| If I missed I apologize, but is the primary Paul route for? | 2025-07-02 10:11:34 | |
| Deliveries and traffic for the workers. Is that gonna be going north? | 2025-07-02 10:11:37 | |
| N Highway 14 or S Highway 392. | 2025-07-02 10:11:40 | |
| Is actually said to 14 to 14, OK and so then that. | 2025-07-02 10:11:43 | |
| Stretch in the road maintenance agreement will probably be covered under. | 2025-07-02 10:11:46 | |
| Suppression as normal. OK and then the only other. | 2025-07-02 10:11:49 | |
| Question I have at this time, Mike, is I'm. | 2025-07-02 10:11:52 | |
| I'm looking at the parcel, the subject parcel. I see that. | 2025-07-02 10:11:55 | |
| One of the oil and gas access locations was. | 2025-07-02 10:11:58 | |
| Uh, changes that we made deleting those. | 2025-07-02 10:35:53 | |
| New paragraph. | 2025-07-02 10:35:56 | |
| Right where you are. Do you have any questions? | 2025-07-02 10:35:59 | |
| Questions on deleting those two? No, no issues. | 2025-07-02 10:36:02 | |
| OK. Thank you. OK. | 2025-07-02 10:36:05 | |
| With that, I'll bring it back to the Board and the Chair. | 2025-07-02 10:36:08 | |
| Stating is my findings of fact the work of? | 2025-07-02 10:36:11 | |
| The planning staff. The findings of Planning Commission. | 2025-07-02 10:36:14 | |
| Draft resolution presented here and amended to do. | 2025-07-02 10:36:17 | |
| I move, we approve you. | 2025-07-02 10:36:20 | |
| Senior Permit 2500. | 2025-07-02 10:36:23 | |
| 004 for solar energy facility outside of subdivision. | 2025-07-02 10:36:26 | |
| Destroyed contacts in the ACT. | 2025-07-02 10:36:30 | |
| Cultural Zone District The 35321. | 2025-07-02 10:36:33 | |
| They say LLC care of RDC Colorado. | 2025-07-02 10:36:35 | |
| Well, counting RS722 LLC. | 2025-07-02 10:36:39 | |
| 0005, Commissioner. | 2025-07-02 10:36:42 | |
| Sure, OK, I would. 2nd 0005. | 2025-07-02 10:36:45 | |
| You guys looked at the wrong one. | 2025-07-02 10:36:48 | |
| It has been moved by Commissioner. | 2025-07-02 10:36:50 | |
| Uh, slated to be closed? I'm not sure if that. | 2025-07-02 10:12:01 | |
| Happened yet or not but this so. | 2025-07-02 10:12:04 | |
| Solar installation? Is that proposed to have it all? | 2025-07-02 10:12:07 | |
| Own separate access separate from the residence. | 2025-07-02 10:12:10 | |
| Actually have to look to confirm that, uh, I think. | 2025-07-02 10:12:13 | |
| In my referral I was just saying that if they select a. | 2025-07-02 10:12:16 | |
| A site on County Road 49 because. | 2025-07-02 10:12:19 | |
| This is a local Rd. They have to meet the spacing requirements. | 2025-07-02 10:12:22 | |
| Requirements actually identified in Section 8. | 2025-07-02 10:12:25 | |
| 8-14-30 of the Weld County Code. | 2025-07-02 10:12:28 | |
| So that'll be determined kind of when they're trying to get their. | 2025-07-02 10:12:31 | |
| Permit. OK. I just I mean I know. | 2025-07-02 10:12:34 | |
| We always have certain exceptions and I'm always open to certain. | 2025-07-02 10:12:37 | |
| Considerations, but in general one access. | 2025-07-02 10:12:40 | |
| Per parcel usually. So I just I didn't see that anywhere if it was gonna. | 2025-07-02 10:12:43 | |
| Be utilizing the residential or a new one. | 2025-07-02 10:12:46 | |
| Was gonna be proposed that that could be a question for the applicant when they. | 2025-07-02 10:12:49 | |
| Come up here to maybe clarify that to see what their intentions are, yeah. | 2025-07-02 10:12:52 | |
| Good morning. | 2025-07-02 10:00:30 | |
| Board hearings is July 2nd. | 2025-07-02 10:00:36 | |
| 25 Used by special review permit. | 2025-07-02 10:00:39 | |
| USR 25-0004. | 2025-07-02 10:00:42 | |
| Case number USR 25. | 2025-07-02 10:00:45 | |
| 5-0004 Applicant. | 2025-07-02 10:00:48 | |
| 35321 Estate, LLC. | 2025-07-02 10:00:51 | |
| Take care of RDC Cocoa. | 2025-07-02 10:00:54 | |
| County RS722L. | 2025-07-02 10:00:57 | |
| LLC request used by special review. | 2025-07-02 10:01:00 | |
| Permit for a solar energy facility SES. | 2025-07-02 10:01:03 | |
| Outside of subdivisions and historic towns in the. | 2025-07-02 10:01:06 | |
| Agricultural zone. District legal description. | 2025-07-02 10:01:09 | |
| Be amended. Recorded exemption. | 2025-07-02 10:01:12 | |
| 1:00 AM RE CX-18. | 2025-07-02 10:01:15 | |
| Dash 12-0095. | 2025-07-02 10:01:18 | |
| Being part of the South half. | 2025-07-02 10:01:21 | |
| Southeast quarter of Section 4 Township. | 2025-07-02 10:01:24 | |
| 6 N range, 66 W of the 6:00 PM West. | 2025-07-02 10:01:27 | |
| County, Colorado. Location north. | 2025-07-02 10:01:30 | |
| Adjacent to County Road 72, approximately. | 2025-07-02 10:01:33 | |
| We will try to actually restrict it to 1. | 2025-07-02 10:12:55 | |
| Access per parcel if possible. Alright, thank you Sir. | 2025-07-02 10:12:58 | |
| You're welcome. Alright. Any other questions? | 2025-07-02 10:13:01 | |
| Apple's in here. | 2025-07-02 10:13:07 | |
| OK. We have a couple of questions to. | 2025-07-02 10:13:10 | |
| Ask you one, there are four out of five. | 2025-07-02 10:13:13 | |
| Commissioner's here in case this is a 2 to 2. | 2025-07-02 10:13:16 | |
| Vote Commissioner Rice will have to listen. | 2025-07-02 10:13:19 | |
| Listen to the hearing and and add. | 2025-07-02 10:13:22 | |
| His boat, Are you comfortable with that, being that it could be? | 2025-07-02 10:13:25 | |
| Yes, I am OK and then. | 2025-07-02 10:13:28 | |
| And have you or the applicant? | 2025-07-02 10:13:31 | |
| Had any communication with the Commissioner, uh, of? | 2025-07-02 10:13:34 | |
| About this land request. | 2025-07-02 10:13:37 | |
| No. OK. And then again. | 2025-07-02 10:13:40 | |
| If you just want to give your name and address and proceed. | 2025-07-02 10:13:43 | |
| Alright, so my name is James. | 2025-07-02 10:13:46 | |
| Accidentally not sure if y'all can hear me going to hear. | 2025-07-02 10:13:50 | |
| With and location right? | 2025-07-02 10:13:52 | |
| Address is 2045 W Grand. | 2025-07-02 10:13:55 | |
| And that's Chicago, IL. | 2025-07-02 10:13:58 | |
| And I'm representing the applicant. | 2025-07-02 10:14:02 | |
| I'm with reactivate. | 2025-07-02 10:14:04 | |
| Believe we had a slide show. Mm-hmm. Got it. OK. | 2025-07-02 10:14:08 | |
| OK. Thank you. | 2025-07-02 10:14:17 | |
| Again, thank you for for hearing me today. | 2025-07-02 10:14:20 | |
| I know I'm the only one on the docket so. | 2025-07-02 10:14:23 | |
| Takes time and if you can't hear. | 2025-07-02 10:14:25 | |
| Please let me know, I am going to try to. | 2025-07-02 10:14:29 | |
| Turning back and forth here. | 2025-07-02 10:14:32 | |
| Uh, yes, we're a USR 20. | 2025-07-02 10:14:35 | |
| 5005 umm. | 2025-07-02 10:14:38 | |
| Proposing a solar energy. | 2025-07-02 10:14:41 | |
| Energy Facility. | 2025-07-02 10:14:44 | |
| I'm with reactivate a little bit about React. | 2025-07-02 10:14:47 | |
| Activate our parent company is. | 2025-07-02 10:14:50 | |
| Is invenergy. They're nationally known. | 2025-07-02 10:14:53 | |
| Renew, leader in renewables here in. | 2025-07-02 10:14:56 | |
| The US and we are the. | 2025-07-02 10:14:59 | |
| Subsidiary to Invenergy. | 2025-07-02 10:15:02 | |
| We are an owner Opera. | 2025-07-02 10:15:05 | |
| Creator and developer of our projects, so we see the project. | 2025-07-02 10:15:08 | |
| All the way through from start to finish. | 2025-07-02 10:15:11 | |
| Into operation. We are a communi. | 2025-07-02 10:15:14 | |
| Skill developer. So on the distribution. | 2025-07-02 10:15:17 | |
| Now where we differ from. | 2025-07-02 10:15:20 | |
| Our parent company is. We are. | 2025-07-02 10:15:23 | |
| On that community scale and and parent company is is the. | 2025-07-02 10:15:26 | |
| Utility scale. So for those that that. | 2025-07-02 10:15:29 | |
| May not know you know we we we have a less. | 2025-07-02 10:15:32 | |
| Impact of smaller footprint when we. | 2025-07-02 10:15:35 | |
| Do community scale. We typically work with one landowner. | 2025-07-02 10:15:38 | |
| And you know for this project. | 2025-07-02 10:15:41 | |
| It's a 30 acre, 30 acre. | 2025-07-02 10:15:44 | |
| Proposal on a 73 acre lot when you may see. | 2025-07-02 10:15:47 | |
| On the utility scale, you'll see 2000 + A. | 2025-07-02 10:15:50 | |
| And I think they're 50 to, you know. | 2025-07-02 10:15:53 | |
| 100,000 megawatts broad. | 2025-07-02 10:15:56 | |
| So very large scale projects and so that's kind of where we. | 2025-07-02 10:15:59 | |
| We're different. We tie into the local grid. | 2025-07-02 10:16:02 | |
| On the distribution side, so really we don't require. | 2025-07-02 10:16:05 | |
| Buy a whole lot of additional infrastructure we. | 2025-07-02 10:16:08 | |
| We tend to aim at parcels that. | 2025-07-02 10:16:11 | |
| Have that infrastructure adjacent. | 2025-07-02 10:16:14 | |
| If we do have to require an extension, then they. | 2025-07-02 10:16:17 | |
| Typical. Those extensions typically go through the utility and. | 2025-07-02 10:16:20 | |
| CO2 existing easements are right away. | 2025-07-02 10:16:23 | |
| A little bit about the. | 2025-07-02 10:16:29 | |
| Project site Matthew did a great job of explaining. | 2025-07-02 10:16:32 | |
| Where we're at and. | 2025-07-02 10:16:35 | |
| This, of course, we're in Weld County. | 2025-07-02 10:16:38 | |
| And it's designated as AG land. | 2025-07-02 10:16:41 | |
| But it's not irrigated and the only. | 2025-07-02 10:16:44 | |
| Owner is uses it for. | 2025-07-02 10:16:47 | |
| It's. | 2025-07-02 10:16:47 | |
| It's not used for anything currently. | 2025-07-02 10:16:50 | |
| It it was told to me that there. | 2025-07-02 10:16:53 | |
| Was crops attempted to be planted? | 2025-07-02 10:16:56 | |
| Out there 3-3 different times. | 2025-07-02 10:16:59 | |
| However, none of them would take and. | 2025-07-02 10:17:02 | |
| The the owner decided that that was not the. | 2025-07-02 10:17:05 | |
| The route that they wanted to go with their property. | 2025-07-02 10:17:08 | |
| Umm, we're not removing anything. So therefore. | 2025-07-02 10:17:11 | |
| We're not removing any land from production. | 2025-07-02 10:17:14 | |
| On this proposal. | 2025-07-02 10:17:17 | |
| Project actually, as Matthew showed. | 2025-07-02 10:17:20 | |
| On the side is is located about 1000 feet. | 2025-07-02 10:17:23 | |
| East offset from. | 2025-07-02 10:17:26 | |
| 49. | 2025-07-02 10:17:29 | |
| Again. | 2025-07-02 10:17:32 | |
| Not in any IGA or Cpas. | 2025-07-02 10:17:35 | |
| So there's no other agreements with any agent? | 2025-07-02 10:17:38 | |
| Townships required here. | 2025-07-02 10:17:41 | |
| And just a little, this is one of our projects down here on. | 2025-07-02 10:17:47 | |
| Bottom right of. | 2025-07-02 10:17:50 | |
| An existing project here in. | 2025-07-02 10:17:53 | |
| In Illinois that we've done to kind of just show you a little. | 2025-07-02 10:17:56 | |
| 450 feet West of County Road 31. | 2025-07-02 10:01:36 | |
| Notice was published May 17th, 2020. | 2025-07-02 10:01:39 | |
| In the Greeley Tribune. Good morning, Molly. | 2025-07-02 10:01:42 | |
| Morning first Nurse Molly Wright, Department of Planning Service. | 2025-07-02 10:01:46 | |
| First, this case was heard before the Planning Commission. | 2025-07-02 10:01:48 | |
| Percent on June 3rd, 2025 during the planning. | 2025-07-02 10:01:52 | |
| Permission. Several surrounding property owners spoke without. | 2025-07-02 10:01:55 | |
| The applicant is requesting a continuous. | 2025-07-02 10:01:57 | |
| August 6th, 2025 in order to fir. | 2025-07-02 10:02:01 | |
| Outreach to further their outreach efforts with the. | 2025-07-02 10:02:04 | |
| Surrounding property owners. Good to know. | 2025-07-02 10:02:07 | |
| Alright, are there any questions with Molly? | 2025-07-02 10:02:10 | |
| I move to approve the continuance. | 2025-07-02 10:02:13 | |
| You gotta open it up. I'm in a rush. | 2025-07-02 10:02:16 | |
| All right, see, now I'm just. | 2025-07-02 10:02:19 | |
| This is a public hearing. Is there anyone in the audience that would like to? | 2025-07-02 10:02:22 | |
| Speak on the news by special review permit USR. | 2025-07-02 10:02:25 | |
| 25-0004. | 2025-07-02 10:02:28 | |
| See. Oh yes, come on up. | 2025-07-02 10:02:30 | |
| Bit about the array and and sort of the footprint of. | 2025-07-02 10:17:59 | |
| What we'd be looking at for a project similar to this. | 2025-07-02 10:18:02 | |
| Again, we're single at. | 2025-07-02 10:18:05 | |
| Access trackers proposed here on the project. | 2025-07-02 10:18:08 | |
| And so they. | 2025-07-02 10:18:11 | |
| They're more efficient than you're fixed. | 2025-07-02 10:18:14 | |
| Tilt trackers. | 2025-07-02 10:18:17 | |
| Where they, where they, you know they? | 2025-07-02 10:18:20 | |
| They track the sun east to West as it moves. | 2025-07-02 10:18:23 | |
| Oh, another important part here on this project. | 2025-07-02 10:18:29 | |
| Because it's it's got about a 35 to 40 year lifespan. | 2025-07-02 10:18:33 | |
| Decommission Commission. | 2025-07-02 10:18:36 | |
| Of the project, the site goes back. | 2025-07-02 10:18:39 | |
| To its original state. | 2025-07-02 10:18:41 | |
| And again, a few details here. | 2025-07-02 10:18:48 | |
| I believe in. | 2025-07-02 10:18:51 | |
| Some of the conditional approval or conditions for approval. | 2025-07-02 10:18:54 | |
| We'll have to improve this site plan so. | 2025-07-02 10:18:56 | |
| Apologies for not the best site plan here, but we will. | 2025-07-02 10:19:00 | |
| And if you could just give us your name and add. | 2025-07-02 10:02:34 | |
| Press and proceed. Yes ma'am. Thank you. | 2025-07-02 10:02:37 | |
| And thank you, Commissioner, I just wanted to make. | 2025-07-02 10:02:40 | |
| Myself available here for any questions that you may have. | 2025-07-02 10:02:43 | |
| Sounds like you maybe maybe didn't have them, but. | 2025-07-02 10:02:46 | |
| Accidentally, I'm representing, excuse me, representing the Apple. | 2025-07-02 10:02:49 | |
| I'm with reactivate and our address. | 2025-07-02 10:02:52 | |
| Is 2045 W. | 2025-07-02 10:02:55 | |
| Sweet B in Chicago, IL OK. | 2025-07-02 10:02:58 | |
| And I just want to like be available if you have any questions. | 2025-07-02 10:03:01 | |
| For the request for extension. | 2025-07-02 10:03:04 | |
| No questions, but I will say thank you for making. | 2025-07-02 10:03:07 | |
| In further contact with the residents that are surrounding it, seeing. | 2025-07-02 10:03:10 | |
| And how there was quite a few comments that I read in the record, so appreciate that. | 2025-07-02 10:03:13 | |
| Further outreach, of course. Yeah, just wanna make sure. | 2025-07-02 10:03:16 | |
| So that their concerns are addressed and making the. | 2025-07-02 10:03:19 | |
| All right. Any other questions? | 2025-07-02 10:03:22 | |
| Alright. | 2025-07-02 10:03:25 | |
| Have a better one for you for signature. | 2025-07-02 10:19:03 | |
| The proposed access you can. | 2025-07-02 10:19:06 | |
| See here in purple. | 2025-07-02 10:19:09 | |
| On the north portion of the of the track. | 2025-07-02 10:19:12 | |
| Again, it's about 1000 foot run 20. | 2025-07-02 10:19:15 | |
| Feet wide and that would be our main. | 2025-07-02 10:19:18 | |
| Point of access now umm. | 2025-07-02 10:19:21 | |
| If we are looking to reduce that number of action. | 2025-07-02 10:19:24 | |
| Access points we can. | 2025-07-02 10:19:27 | |
| Have that discussion or if it becomes a condition of approval. | 2025-07-02 10:19:30 | |
| We can look into that as well. | 2025-07-02 10:19:33 | |
| Typically why we do. | 2025-07-02 10:19:36 | |
| Proposals access points is we like to have them adjacent to. | 2025-07-02 10:19:39 | |
| What we call the point of interconnection. So that's. | 2025-07-02 10:19:42 | |
| Where the where we would tie onto the grid. | 2025-07-02 10:19:45 | |
| And so that's where we try to aim to have our access point. | 2025-07-02 10:19:48 | |
| Yeah, and just a little bit. | 2025-07-02 10:19:57 | |
| To add on to a community scale, we are low impact, low. | 2025-07-02 10:20:00 | |
| Environmental impact. We have decommission plan. | 2025-07-02 10:20:03 | |
| James, Second by Commissioner Maxine. Further discussion. | 2025-07-02 10:36:54 | |
| All in favor say aye aye. | 2025-07-02 10:36:57 | |
| Congratulations. Yes, thank you, Sir. | 2025-07-02 10:37:00 | |
| See you in August. | 2025-07-02 10:37:02 | |
| Is there anyone umm in the audience that would like to? | 2025-07-02 10:03:28 | |
| Speak. I'm just the continuance special. | 2025-07-02 10:03:31 | |
| Review permit. USR 25-0004. | 2025-07-02 10:03:34 | |
| To move it to August 6th. | 2025-07-02 10:03:37 | |
| See none. I will bring it back to the board. | 2025-07-02 10:03:40 | |
| Now I will move to approve the continuance of you. | 2025-07-02 10:03:43 | |
| CSR250004 to August 6. | 2025-07-02 10:03:46 | |
| 10 AM. | 2025-07-02 10:03:48 | |
| Like Mr. Pepper, Second by Commissioner Maxie. | 2025-07-02 10:03:52 | |
| Further discussion. All in favor say aye. | 2025-07-02 10:03:55 | |
| USR 25-0004 will be moved out. | 2025-07-02 10:04:01 | |
| August 6th. Thanks, Molly. | 2025-07-02 10:04:04 | |
| Right. | 2025-07-02 10:04:42 | |
| Next we have used by special review permit US. | 2025-07-02 10:04:45 | |
| Sorry, 25-0005. | 2025-07-02 10:04:48 | |
| Case number USR. | 2025-07-02 10:04:51 | |
| 25 Dash 0005 AP. | 2025-07-02 10:04:54 | |
| Applicant Juan Pablo Gomez. Mendiola, Carol. | 2025-07-02 10:04:57 | |
| RDC Co Weld County Road 40. | 2025-07-02 10:05:00 | |
| 29 LLC request use by Secial. | 2025-07-02 10:05:03 | |
| In place that remove the project. | 2025-07-02 10:20:06 | |
| At the time of 30. | 2025-07-02 10:20:09 | |
| 4040 years. This is also a requirement of our car. | 2025-07-02 10:20:12 | |
| Contract with the landowner. | 2025-07-02 10:20:15 | |
| I believe Weld County does require a decommissioning bond. | 2025-07-02 10:20:18 | |
| In the event that we wouldn't be able to. | 2025-07-02 10:20:21 | |
| If we weren't around or if the project was sold. | 2025-07-02 10:20:24 | |
| Or if somebody else else's needed to remove the. | 2025-07-02 10:20:27 | |
| Project there would be those funds in place to do so. | 2025-07-02 10:20:30 | |
| Yeah, no permanent water sewer required here. | 2025-07-02 10:20:36 | |
| No lighting for the project. | 2025-07-02 10:20:39 | |
| It's. | 2025-07-02 10:20:42 | |
| It's not a manned operation. During operations, there's there's. | 2025-07-02 10:20:45 | |
| Nobody on site. This is a typical. | 2025-07-02 10:20:48 | |
| Occasional maintenance required until you'll see maybe 1. | 2025-07-02 10:20:51 | |
| One night trip every 10 days. | 2025-07-02 10:20:54 | |
| And that's in our in our maintenance contract. | 2025-07-02 10:20:57 | |
| Now I don't know if this is. | 2025-07-02 10:21:06 | |
| Something that I can discuss because I believe. | 2025-07-02 10:21:09 | |
| Review permit for solar energy facility. | 2025-07-02 10:05:06 | |
| SEF outside of subdivisions and historic town. | 2025-07-02 10:05:09 | |
| Some sites in the agricultural zone district legal. | 2025-07-02 10:05:12 | |
| Prescription N half Northwest quarter of. | 2025-07-02 10:05:15 | |
| Section 19. Township 7. N Range 6. | 2025-07-02 10:05:18 | |
| Before West of the 6:00 PM Weld County, Colorado. | 2025-07-02 10:05:21 | |
| Location east of an adjacent to County Road 40. | 2025-07-02 10:05:24 | |
| 2009 S of an adjacent 2 County Road. | 2025-07-02 10:05:27 | |
| 82nd line notice was published May. | 2025-07-02 10:05:30 | |
| 19th, 2025 and the Greeley Tribune. | 2025-07-02 10:05:33 | |
| All right. Good morning. Good morning. | 2025-07-02 10:05:36 | |
| Madam Chair and Commissioners Matthew Vanilla, Department of Planning Service. | 2025-07-02 10:05:39 | |
| Services the applicant reactivate is proposing to. | 2025-07-02 10:05:42 | |
| Construct a solar energy facility on approximately. | 2025-07-02 10:05:45 | |
| 30 acres of a 73 acre site. | 2025-07-02 10:05:48 | |
| The maximum height of the solar panels will not exceed 25. | 2025-07-02 10:05:51 | |
| Feet and height is measured from the highest grade. | 2025-07-02 10:05:54 | |
| Below each below each solar panel. | 2025-07-02 10:05:57 | |
| Karen in the last meeting. | 2025-07-02 10:21:12 | |
| It was. | 2025-07-02 10:21:15 | |
| For tax benefit analysis. | 2025-07-02 10:21:18 | |
| I can skip over it. I didn't. | 2025-07-02 10:21:21 | |
| It from the I'd skip over it OK. | 2025-07-02 10:21:24 | |
| OK, so yeah, that sums up our project. | 2025-07-02 10:21:30 | |
| All right. Well, thank you very much. Does anybody have any? | 2025-07-02 10:21:33 | |
| Of the applicant, Commissioner Maxey. Thank you, Madam Chair. | 2025-07-02 10:21:36 | |
| Thank you James for the presentation. Just. | 2025-07-02 10:21:39 | |
| A couple quick questions based on what I saw on the. | 2025-07-02 10:21:42 | |
| Excuse me, slides you presented and also I believe you can. | 2025-07-02 10:21:45 | |
| Kind of address the access point it sounds like. | 2025-07-02 10:21:48 | |
| The intent would be to have a access kind of on that. | 2025-07-02 10:21:51 | |
| North property line where you showed the interconnect. | 2025-07-02 10:21:54 | |
| And the utility coming into the array. | 2025-07-02 10:21:57 | |
| I think that's going to be a point of discussion just with our. | 2025-07-02 10:22:00 | |
| Staff and justice with my knowledge. | 2025-07-02 10:22:03 | |
| Of desiring usually a single access for a product. | 2025-07-02 10:22:06 | |
| Property and this one already has that access. So anyway to consult? | 2025-07-02 10:22:09 | |
| To the highest extent of the solar panel rotation. | 2025-07-02 10:06:00 | |
| During construction, there will be a crew of about 85 P. | 2025-07-02 10:06:03 | |
| On site each day construction activities. | 2025-07-02 10:06:06 | |
| Will take place Monday through Friday, 7:00 AM to. | 2025-07-02 10:06:09 | |
| 5:00 PM. Any debris, junk or waste associated. | 2025-07-02 10:06:12 | |
| Do with the building. With building the project will be. | 2025-07-02 10:06:15 | |
| Validate would always be a good thing. That's just my opinion. | 2025-07-02 10:22:12 | |
| Umm, I'm curious on the topography of the land. Are you able to? | 2025-07-02 10:22:15 | |
| Keep the photography and have the array kind of follow. | 2025-07-02 10:22:18 | |
| The existing topography are you going to have to do quite a bit of of. | 2025-07-02 10:22:21 | |
| Grading work which can affect future. | 2025-07-02 10:22:24 | |
| Your ability to to farm that land once this might. | 2025-07-02 10:22:27 | |
| Be decommissioned? Yes, of course. Great question. | 2025-07-02 10:22:30 | |
| Commissioner Maxine, thank you for that, umm, with. | 2025-07-02 10:22:33 | |
| With our projects, we typically aim to. | 2025-07-02 10:22:36 | |
| To focus on sites that do not require. | 2025-07-02 10:22:39 | |
| Bar grading so we we keep the. | 2025-07-02 10:22:42 | |
| The natural flow of the land there's. | 2025-07-02 10:22:45 | |
| Required on our projects because you know. | 2025-07-02 10:22:48 | |
| As you may know, dirt work is very expensive. | 2025-07-02 10:22:51 | |
| We try to keep that to a minimum. | 2025-07-02 10:22:54 | |
| So it's really a simple. | 2025-07-02 10:22:57 | |
| Top soil type of removal we do. | 2025-07-02 10:23:01 | |
| Receding revegetation for the project to kind of. | 2025-07-02 10:23:04 | |
| Keep that soil enriched during the life cycle of the. | 2025-07-02 10:23:07 | |
| Project and then actually. | 2025-07-02 10:23:09 | |
| Missing there is a revegetation. | 2025-07-02 10:23:13 | |
| Because we remove the. | 2025-07-02 10:23:16 | |
| The materials from the project so. | 2025-07-02 10:23:19 | |
| Yeah, openly. No, there would be minimum. | 2025-07-02 10:23:22 | |
| Minimal grading for the site. | 2025-07-02 10:23:24 | |
| Thank you for that, umm, just in our experience and the information. | 2025-07-02 10:23:28 | |
| We've been presented for projects such as this, the more you. | 2025-07-02 10:23:31 | |
| Grade means more compaction means more removal of top. | 2025-07-02 10:23:34 | |
| Which then when you're talking decommissioning lenses. | 2025-07-02 10:23:36 | |
| Self to not being too agriculturally friendly. Friendly. | 2025-07-02 10:23:40 | |
| So the less grading possible, that's why I asked. | 2025-07-02 10:23:43 | |
| And just due to future agricultural potential. | 2025-07-02 10:23:46 | |
| Curiosity question. | 2025-07-02 10:23:49 | |
| I saw 35 to 40 years lifespan which is. | 2025-07-02 10:23:52 | |
| Longer than what I'm typically used to hearing. Can you explain? | 2025-07-02 10:23:55 | |
| That a little bit most the time for solar projects we see anywhere. | 2025-07-02 10:23:58 | |
| Between 20 to 30 years, so this one is quite a bit longer. | 2025-07-02 10:24:01 | |
| Yeah, no, I think it's technol. | 2025-07-02 10:24:04 | |
| You know is is more prevalent in. | 2025-07-02 10:24:07 | |
| In these systems, they're able to. | 2025-07-02 10:24:10 | |
| To last longer, I think the lifespan is really contro. | 2025-07-02 10:24:13 | |
| Controlled by the maintenance and how well. | 2025-07-02 10:24:16 | |
| These panels there becomes a. | 2025-07-02 10:24:19 | |
| Time when maintenance overruns, you know. | 2025-07-02 10:24:22 | |
| The functioning and operation of the Pro. | 2025-07-02 10:24:25 | |
| Roject and so we've we've. | 2025-07-02 10:24:28 | |
| Outlay it to 30 to 40 years I think. | 2025-07-02 10:24:31 | |
| It's it's 30 to 35 years and. | 2025-07-02 10:24:34 | |
| In our contract we do have an option for an additional if we still. | 2025-07-02 10:24:37 | |
| Or have functioning. Or have functioning. | 2025-07-02 10:24:40 | |
| A functioning project now. | 2025-07-02 10:24:43 | |
| We, like I said, we do maintain these. | 2025-07-02 10:24:46 | |
| Panels we do replacements and so. | 2025-07-02 10:24:49 | |
| So that's really where we try to get to that 30. | 2025-07-02 10:24:52 | |
| To 40 years and I think like. | 2025-07-02 10:24:55 | |
| Like I said, I think technology improving in the efficiencies of these. | 2025-07-02 10:24:58 | |
| Panels has helped that life cycle, that lifespan. | 2025-07-02 10:25:01 | |
| OK. Thank you for that. And last question, Madam. | 2025-07-02 10:25:04 | |
| Could you please briefly describe your? | 2025-07-02 10:25:07 | |
| Interactions with CPW and what your thoughts are on their referral. | 2025-07-02 10:25:10 | |
| Yes. Oh, OK. | 2025-07-02 10:25:16 | |
| Yes, sure. | 2025-07-02 10:25:19 | |
| So our interactions with CPW. | 2025-07-02 10:25:22 | |
| We work with TPW all over. | 2025-07-02 10:25:25 | |
| So for for several of our. | 2025-07-02 10:25:28 | |
| Rojects and we understand that there are critical. | 2025-07-02 10:25:31 | |
| Habitats that exist in. | 2025-07-02 10:25:34 | |
| In certain areas and so I think one of the. | 2025-07-02 10:25:37 | |
| The first priorities for them is. | 2025-07-02 10:25:40 | |
| In a situation where. | 2025-07-02 10:25:43 | |
| Critical habitat is to be disturbed is for us to remove that project. | 2025-07-02 10:25:46 | |
| Check out of the disturbed area. | 2025-07-02 10:25:49 | |
| Fortunately for this project, we don't have that. | 2025-07-02 10:25:52 | |
| And actually in. | 2025-07-02 10:25:55 | |
| This project the recommendation. I think there was a. | 2025-07-02 10:25:58 | |
| Burrowing Owl concern. | 2025-07-02 10:26:01 | |
| And so they recommended. | 2025-07-02 10:26:04 | |
| Prior to construction. I know that if we do. | 2025-07-02 10:26:07 | |
| Find those, then they have a construction manager. | 2025-07-02 10:26:10 | |
| On site or somebody that specifically? | 2025-07-02 10:26:13 | |
| Monitors those interactions. | 2025-07-02 10:26:16 | |
| And that disturbance and so. | 2025-07-02 10:26:19 | |
| We would we would follow their recommendation. | 2025-07-02 10:26:22 | |
| For this and attempt to do those services. | 2025-07-02 10:26:25 | |
| Do not disturb. I think it was a Groundhog. | 2025-07-02 10:26:28 | |
| Population in the area and so. | 2025-07-02 10:26:31 | |
| They identify burning owls to be located. | 2025-07-02 10:26:34 | |
| Adjacent or within the same habitat, so. | 2025-07-02 10:26:37 | |
| Yeah, that that was the interaction with CPW. | 2025-07-02 10:26:40 | |
| You and we understand the condition. | 2025-07-02 10:26:43 | |
| There OK, so just to be clear if I. | 2025-07-02 10:26:46 | |
| Heard you correctly. | 2025-07-02 10:26:49 | |
| Even though. | 2025-07-02 10:26:49 | |
| This location is not an identified high priority. | 2025-07-02 10:26:52 | |
| Habitat for CPW they still. | 2025-07-02 10:26:55 | |
| They still requested a couple things from you. One of them is. | 2025-07-02 10:26:58 | |
| The Burrowing Owl survey one of them. | 2025-07-02 10:27:01 | |
| Wildlife friendly sensing you plan to. | 2025-07-02 10:27:04 | |
| Knowledge and agree to their comments. | 2025-07-02 10:27:07 | |
| In the referral, even though this is not in high priority habitat. | 2025-07-02 10:27:10 | |
| Yes, that's correct. Yes, and. | 2025-07-02 10:27:13 | |
| I believe the fencing is part of our. | 2025-07-02 10:27:16 | |
| A proposal to begin with. I can't. I don't. | 2025-07-02 10:27:19 | |
| Have the the recommendation. | 2025-07-02 10:27:22 | |
| Here from CPW, but we. | 2025-07-02 10:27:25 | |
| Do with with our projects we propose either? | 2025-07-02 10:27:28 | |
| A six foot 6 foot barbed wire fence or. | 2025-07-02 10:27:31 | |
| Or I believe the seven foot game fence. | 2025-07-02 10:27:34 | |
| In this scenario, I believe they're asking for the game fence. | 2025-07-02 10:27:37 | |
| At 8 feet I believe 8 feet no BBQ. | 2025-07-02 10:27:40 | |
| On the top strand. | 2025-07-02 10:27:43 | |
| So the seven feet? | 2025-07-02 10:27:46 | |
| 8 feet I. | 2025-07-02 10:27:49 | |
| That that's doable. I don't care about that. | 2025-07-02 10:27:52 | |
| Please, please know that my comments are to just seek clarity. | 2025-07-02 10:27:55 | |
| It is the opinion of 1 Commissioner. This Commissioner. | 2025-07-02 10:27:58 | |
| Out of the four that are up here that since this is not in. | 2025-07-02 10:28:01 | |
| High priority habitat. In my opinion there is no need. | 2025-07-02 10:28:04 | |
| Adhere to their referral requirements, but that is. | 2025-07-02 10:28:07 | |
| Is my opinion. Thank you. Thank you. | 2025-07-02 10:28:10 | |
| Send it to greenside quickly before I get to Commissioner Commission. | 2025-07-02 10:28:13 | |
| James is uh, do you have a contract with UH? | 2025-07-02 10:28:16 | |
| A utilities company, so you get. | 2025-07-02 10:28:22 | |
| Thank you for that question. Yes, currently we are. | 2025-07-02 10:28:25 | |
| In the process of obtaining that contract. | 2025-07-02 10:28:28 | |
| We're working with Xcel Energy for this project. | 2025-07-02 10:28:31 | |
| So there's several steps to those. | 2025-07-02 10:28:34 | |
| You know, it's what we refer to as an interconnection agreement. | 2025-07-02 10:28:37 | |
| Consists of a pre application to understand. | 2025-07-02 10:28:43 | |
| Sort of the capacity that is on that line. | 2025-07-02 10:28:46 | |
| We've already got been through that process and then. | 2025-07-02 10:28:49 | |
| And we're currently in what we call a full application. | 2025-07-02 10:28:52 | |
| Process of that and I think there's three different studies that are required. | 2025-07-02 10:28:55 | |
| Within that they're very lengthy. | 2025-07-02 10:28:58 | |
| Processes and also they. | 2025-07-02 10:29:01 | |
| Extensive but to. | 2025-07-02 10:29:04 | |
| To answer your question, currently we are. | 2025-07-02 10:29:07 | |
| In that process, we do not have the agreement, but we are. | 2025-07-02 10:29:10 | |
| Pursuing it, OK. And another question is do you have any? | 2025-07-02 10:29:13 | |
| Are there any water rights on in the on this property? | 2025-07-02 10:29:16 | |
| Not to my knowledge. OK, thank you. | 2025-07-02 10:29:19 | |
| Mr. James, thank you and thank you for following up. | 2025-07-02 10:29:22 | |
| Pray to Commissioner Maxie's standard question. | 2025-07-02 10:29:25 | |
| Facilities which I agree with, by the way. | 2025-07-02 10:29:28 | |
| I don't know whether the seven or the 8 foot fence would be better to keep that owl. | 2025-07-02 10:29:31 | |
| In or out, but heck, I'm not going on that one. I've heard their flight list. | 2025-07-02 10:29:35 | |
| Probably, umm. | 2025-07-02 10:29:37 | |
| My question is one of the concerns for soil conditions. | 2025-07-02 10:29:40 | |
| Weed mitigation and that type of thing. What? | 2025-07-02 10:29:43 | |
| Condition of the soil. Now I'm looking at a Google Earth view of it and it looks like. | 2025-07-02 10:29:46 | |
| Crops had been planted and you had got some duct out there. | 2025-07-02 10:29:50 | |
| Would you would you call it pasture land? | 2025-07-02 10:29:52 | |
| What is what is the existing nature of the soil that. | 2025-07-02 10:29:55 | |
| There, sure. Thank you for that question. | 2025-07-02 10:29:59 | |
| It is a natural, natural soil. Natural. | 2025-07-02 10:30:05 | |
| Natural habitat out there. | 2025-07-02 10:30:08 | |
| And I believe the only thing that it's used. | 2025-07-02 10:30:10 | |
| Or is past language grazing? | 2025-07-02 10:30:13 | |
| Mr. Gomez has goats and sheep on site. | 2025-07-02 10:30:17 | |
| And you know he uses. | 2025-07-02 10:30:20 | |
| Those to either graze or. | 2025-07-02 10:30:23 | |
| You know to keep that that. | 2025-07-02 10:30:25 | |
| To mitigate those the growth. | 2025-07-02 10:30:29 | |
| It's not blowing dust. So there's an established land there. We. | 2025-07-02 10:30:32 | |
| Because it is fine and your your intent. | 2025-07-02 10:30:35 | |
| Into overseas is a good intention. | 2025-07-02 10:30:38 | |
| And and I appreciate that. So that was my largest concern is this. | 2025-07-02 10:30:41 | |
| Blowing sand and and weeded mitigation and that kind of thing. But it sounds like it's got. | 2025-07-02 10:30:44 | |
| So thank you. Yes, Sir. Thank you. Yeah. | 2025-07-02 10:30:47 | |
| Education management would would. | 2025-07-02 10:30:50 | |
| Address those concerns and erosion as well. | 2025-07-02 10:30:53 | |
| That was absolutely my concern. | 2025-07-02 10:30:56 | |
| And also that if you could just. | 2025-07-02 10:30:59 | |
| Disturbed the soil only where the uprights are going, as opposed to. | 2025-07-02 10:31:02 | |
| The rest of it, you've already stated that he's a 10. | 2025-07-02 10:31:05 | |
| To see. | 2025-07-02 10:31:08 | |
| The crops have not taken. | 2025-07-02 10:31:11 | |
| UN quote. So what's to say that even the native. | 2025-07-02 10:31:14 | |
| Grasses would take so at least it. | 2025-07-02 10:31:17 | |
| If you can disturb on this and have. | 2025-07-02 10:31:20 | |
| Plan B in. | 2025-07-02 10:31:23 | |
| In your pocket in case that doesn't take and it starts blowing. | 2025-07-02 10:31:26 | |
| Yeah, so. | 2025-07-02 10:31:32 | |
| The attempt, yes, would be to vegetate with the. | 2025-07-02 10:31:35 | |
| With a native seed. | 2025-07-02 10:31:38 | |
| That that would grow and reduce federal. | 2025-07-02 10:31:41 | |
| And that also. | 2025-07-02 10:31:44 | |
| A weed mitigation and dust control. | 2025-07-02 10:31:47 | |
| However. | 2025-07-02 10:31:50 | |
| I can't foresee you know how that will work. | 2025-07-02 10:31:53 | |
| But you're having a Plan B in place. | 2025-07-02 10:31:56 | |
| For additional watering. | 2025-07-02 10:31:59 | |
| May be beneficial. We don't. | 2025-07-02 10:32:02 | |
| Don't have that in place at the time, you know. | 2025-07-02 10:32:05 | |
| We really just aim to see. | 2025-07-02 10:32:08 | |
| And then you take so that. | 2025-07-02 10:32:11 | |
| To do our best to reduce erosion. | 2025-07-02 10:32:14 | |
| And stuff. | 2025-07-02 10:32:17 | |
| That place. | 2025-07-02 10:32:20 | |
| Into my comments about grading as well. I mean the less that they disturb the. | 2025-07-02 10:32:23 | |
| Soil the better. Yeah, I agree with that. | 2025-07-02 10:32:26 | |
| All right. Any other questions? | 2025-07-02 10:32:29 | |
| OK, if you want to step back, well. | 2025-07-02 10:32:32 | |
| Just for a second, this is a public. | 2025-07-02 10:32:35 | |
| Hearing Is there anybody else in the audience that would like to speak? | 2025-07-02 10:32:38 | |
| On special review. | 2025-07-02 10:32:41 | |
| 25-0005. | 2025-07-02 10:32:44 | |
| OK. | 2025-07-02 10:32:47 | |
| Seeing no one. | 2025-07-02 10:32:47 | |
| Come back. I'm sorry. Alright. Have you? | 2025-07-02 10:32:50 | |
| Had a chance to look at the conditions of approval and. | 2025-07-02 10:32:53 | |
| The development standards, Sir, I have. And you have any questions? | 2025-07-02 10:32:56 | |
| Questions and changes that you would like to make. | 2025-07-02 10:32:59 | |
| I don't believe I do. | 2025-07-02 10:33:02 | |
| I am in agreement with them. | 2025-07-02 10:33:05 | |
| OK, well, let's go through. | 2025-07-02 10:33:08 | |
| OK. | 2025-07-02 10:33:14 | |
| Start with. Let's just. | 2025-07-02 10:33:17 | |
| That was Page 3. | 2025-07-02 10:33:20 | |
| Page 4. | 2025-07-02 10:33:23 | |
| Just a quick comment, Madam Chair, I'm not requesting. | 2025-07-02 10:33:26 | |
| To change anything, but it's more of a another just. | 2025-07-02 10:33:29 |